ITAC Assessment: GT0412
ITAC logo
ITAC Assessment: GT0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product COMMERCIAL COOKING EQUIPMENT
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 110
Plant Area
n/a
Annual Production 274,000
lb
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,432 905,920
kWh
Natural Gas $30,872 7,186
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,616 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,101

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $100 $250 $100
1,172
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,550 $600 $2,550
30,481
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,175 $1,366 $3,175
38,101
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $331 $175 $331
4,103
kWh
-
05 2.4133: Use most efficient type of electric motors $120 $130 $120
1,465
kWh
-
06 2.1221: Replace obsolete burners with more efficient ones $7,340 $66,000 - $7,340
-
MMBtu
TOTAL RECOMMENDED $13,616 $68,521 $6,276
75,322
kWh
$7,340
-
MMBtu
TOTAL IMPLEMENTED $3,101 $1,155 $3,101
37,221
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs