ITAC Assessment: GT0405
ITAC logo
ITAC Assessment: GT0405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product WOOLEN FABRICS
NAICS
n/a
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $50
M
to 100
M
# of Employees 650
Plant Area
n/a
Annual Production 198,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,350,801 27,980,071
kWh
Natural Gas $1,162,340 405,193
MMBtu
Fuel Oil #2 $58,340 21,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $141,739 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,965

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7122: Disconnect ballasts $500 $950 $500
10,258
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $31,990 $74,360 $31,990
662,661
kWh
- -
03 2.6232: Install set-back timers $570 $400 $570
11,723
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $27,873 $4,000 - $26,539
-
MMBtu
$1,334
-
MMBtu
05 2.5123: Reduce fluid flow rates $38,794 $13,600 - $38,794
-
MMBtu
-
06 2.2121: Increase amount of condensate returned $36,022 $10,000 - $34,299
-
MMBtu
$1,723
-
MMBtu
07 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $5,990 $4,600 $5,990
123,974
kWh
- -
TOTAL RECOMMENDED $141,739 $107,910 $39,050
808,616
kWh
$99,632
-
MMBtu
$3,057
-
MMBtu
TOTAL IMPLEMENTED $64,965 $15,350 $1,070
21,981
kWh
$60,838
-
MMBtu
$3,057
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs