Assessment Year | 1990 |
---|---|
Principal Product | WOOLEN FABRICS |
NAICS |
n/a
|
SIC | 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing) |
Sales Range | $50 M to 100M |
# of Employees | 650 |
Plant Area |
n/a
|
Annual Production | 198,000
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,350,801 | 27,980,071 |
kWh
|
$0.048 |
Natural Gas | $1,162,340 | 405,193 |
MMBtu
|
$2.87 |
Fuel Oil #2 | $58,340 | 21,280 |
MMBtu
|
$2.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $141,739 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,965 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7122: Disconnect ballasts | $500 | $950 |
$500
10,258
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,990 | $74,360 |
$31,990
662,661
kWh
|
- | - | |
03 | 2.6232: Install set-back timers | $570 | $400 |
$570
11,723
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $27,873 | $4,000 | - |
$26,539
-
MMBtu
|
$1,334
-
MMBtu
|
|
05 | 2.5123: Reduce fluid flow rates | $38,794 | $13,600 | - |
$38,794
-
MMBtu
|
- | |
06 | 2.2121: Increase amount of condensate returned | $36,022 | $10,000 | - |
$34,299
-
MMBtu
|
$1,723
-
MMBtu
|
|
07 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $5,990 | $4,600 |
$5,990
123,974
kWh
|
- | - | |
TOTAL RECOMMENDED | $141,739 | $107,910 |
$39,050
808,616
kWh
|
$99,632
-
MMBtu
|
$3,057
-
MMBtu
|
||
TOTAL IMPLEMENTED | $64,965 | $15,350 |
$1,070
21,981
kWh
|
$60,838
-
MMBtu
|
$3,057
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs