ITAC Assessment: GT0402
ITAC logo
ITAC Assessment: GT0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ALUMINUM EXTRUSIONS
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $873,272 13,854,045
kWh
Natural Gas $261,314 87,721
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $5,300 $400 - $5,300
-
MMBtu
02 2.7261: Install timers and/or thermostats $4,600 $4,280 - $4,600
-
MMBtu
03 2.4133: Use most efficient type of electric motors $3,082 $15,680 $3,082
48,945
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,560 $29,770 $15,560
247,069
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,000 $1,500 $14,000
221,864
kWh
-
06 2.2514: Cover open tanks $16,700 $20,200 - $16,700
-
MMBtu
07 2.6124: Establish equipment maintenance schedule $4,290 $800 - $4,290
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,292 $13,840 $5,292
83,822
kWh
-
09 2.7243: Improve air circulation with destratification fans / other methods $11,140 $19,320 $(-460.0)
(-20,516)
kWh
$11,600
-
MMBtu
TOTAL RECOMMENDED $79,964 $105,790 $37,474
581,184
kWh
$42,490
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs