Assessment Year | 1990 |
---|---|
Principal Product | ALUMINUM EXTRUSIONS |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $873,272 | 13,854,045 |
kWh
|
$0.063 |
Natural Gas | $261,314 | 87,721 |
MMBtu
|
$2.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,964 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $5,300 | $400 | - |
$5,300
-
MMBtu
|
|
02 | 2.7261: Install timers and/or thermostats | $4,600 | $4,280 | - |
$4,600
-
MMBtu
|
|
03 | 2.4133: Use most efficient type of electric motors | $3,082 | $15,680 |
$3,082
48,945
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,560 | $29,770 |
$15,560
247,069
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,000 | $1,500 |
$14,000
221,864
kWh
|
- | |
06 | 2.2514: Cover open tanks | $16,700 | $20,200 | - |
$16,700
-
MMBtu
|
|
07 | 2.6124: Establish equipment maintenance schedule | $4,290 | $800 | - |
$4,290
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,292 | $13,840 |
$5,292
83,822
kWh
|
- | |
09 | 2.7243: Improve air circulation with destratification fans / other methods | $11,140 | $19,320 |
$(-460.0)
(-20,516)
kWh
|
$11,600
-
MMBtu
|
|
TOTAL RECOMMENDED | $79,964 | $105,790 |
$37,474
581,184
kWh
|
$42,490
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs