ITAC Assessment: GT0399
ITAC logo
ITAC Assessment: GT0399
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PATOTO AND CORN CHIPS
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area
n/a
Annual Production 35,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $539,230 11,854,924
kWh
Natural Gas $442,515 167,371
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,949 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,063

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $615 $285 - $615
-
MMBtu
02 2.2121: Increase amount of condensate returned $910 $300 - $910
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $840 $3,000 - $840
-
MMBtu
04 2.4133: Use most efficient type of electric motors $3,190 $3,930 $3,190
70,047
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $925 $5,000 $925
20,223
kWh
-
06 2.2135: Repair and eliminate steam leaks $1,950 $50 - $1,950
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $431 $229 $431
9,379
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,088 $45,000 $5,088
111,958
kWh
-
TOTAL RECOMMENDED $13,949 $57,794 $9,634
211,607
kWh
$4,315
-
MMBtu
TOTAL IMPLEMENTED $12,063 $54,280 $9,203
202,228
kWh
$2,860
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs