Assessment Year | 1989 |
---|---|
Principal Product | POULTRY |
NAICS |
n/a
|
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $50 M to 100M |
# of Employees | 575 |
Plant Area |
n/a
|
Annual Production | 68,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $638,137 | 12,383,939 |
kWh
|
$0.052 |
Natural Gas | $150,811 | 50,391 |
MMBtu
|
$2.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $100,230 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $85,750 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,040 | - | - |
$1,940
-
MMBtu
|
$(-900.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $604 | $2,400 |
$604
11,723
kWh
|
- | - | |
03 | 2.2511: Insulate bare equipment | $534 | $1,020 | - |
$534
-
MMBtu
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $423 | $210 | - |
$423
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $219 | $350 |
$219
4,396
kWh
|
- | - | |
06 | 2.2624: Use cold waste water to cool chiller feed water | $14,480 | $16,950 |
$14,480
281,360
kWh
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $68,230 | $29,500 | - |
$68,230
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $14,700 | - |
$14,700
285,463
kWh
|
- | - | |
TOTAL RECOMMENDED | $100,230 | $50,430 |
$30,003
582,942
kWh
|
$71,127
-
MMBtu
|
$(-900.0) | ||
TOTAL IMPLEMENTED | $85,750 | $33,480 |
$15,523
301,582
kWh
|
$71,127
-
MMBtu
|
$(-900.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs