ITAC Assessment: GT0388
ITAC logo
ITAC Assessment: GT0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product LUMBER AND PLYWOOD
NAICS
n/a
SIC 2491: Wood Preserving
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area
n/a
Annual Production 51,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,917 602,872
kWh
Natural Gas $94,979 28,002
MMBtu
Fuel Oil #2 $12,009 2,808
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,819 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,119

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $3,330 $3,000 $3,330
-
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,300 $10,000 $5,300
76,202
kWh
-
03 2.4133: Use most efficient type of electric motors $278 $230 $278
4,103
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $626 - $626
8,206
kWh
-
05 2.2136: Install / repair insulation on steam lines $190 $410 - $190
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $25 $15 $25
293
kWh
-
07 2.7261: Install timers and/or thermostats $70 $45 - $70
-
MMBtu
TOTAL RECOMMENDED $9,819 $13,700 $9,559
88,804
kWh
$260
-
MMBtu
TOTAL IMPLEMENTED $1,119 $655 $929
12,602
kWh
$190
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs