Assessment Year | 1989 |
---|---|
Principal Product | INDUSTRIAL CHEMICALS |
NAICS |
n/a
|
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
n/a
|
Annual Production | 70,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $338,690 | 6,356,975 |
kWh
|
$0.053 |
Natural Gas | $544,405 | 181,918 |
MMBtu
|
$2.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,449 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,280 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $17,960 | $20,000 |
$17,960
-
kWh
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $3,050 | $150 | - |
$3,050
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,996 | $8,570 |
$5,996
112,544
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,620 | $1,750 |
$1,620
30,188
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $549 | $687 |
$549
10,258
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,521 | $2,000 |
$1,521
28,429
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $753 | $1,127 |
$753
14,068
kWh
|
- | |
TOTAL RECOMMENDED | $31,449 | $34,284 |
$28,399
195,487
kWh
|
$3,050
-
MMBtu
|
||
TOTAL IMPLEMENTED | $29,280 | $31,847 |
$26,230
155,041
kWh
|
$3,050
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs