ITAC Assessment: GT0383
ITAC logo
ITAC Assessment: GT0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product INDUSTRIAL CHEMICALS
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 70,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $338,690 6,356,975
kWh
Natural Gas $544,405 181,918
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,449 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $17,960 $20,000 $17,960
-
kWh
-
02 2.2135: Repair and eliminate steam leaks $3,050 $150 - $3,050
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,996 $8,570 $5,996
112,544
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,620 $1,750 $1,620
30,188
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $549 $687 $549
10,258
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,521 $2,000 $1,521
28,429
kWh
-
07 2.4133: Use most efficient type of electric motors $753 $1,127 $753
14,068
kWh
-
TOTAL RECOMMENDED $31,449 $34,284 $28,399
195,487
kWh
$3,050
-
MMBtu
TOTAL IMPLEMENTED $29,280 $31,847 $26,230
155,041
kWh
$3,050
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings