Assessment Year | 1998 |
---|---|
Principal Product | Large Aircraft spare parts |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | n/a |
# of Employees | 325 |
Plant Area |
130,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $331,193 | 7,598,476 |
kWh
|
$0.044 |
Electricity Demand | $1,506 | - |
|
- |
Natural Gas | $54,748 | 10,388 |
MMBtu
|
$5.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,874 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,429 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,497 | $26,747 |
$2,850
88,511
kWh
|
$1,395
-
kW-mo/yr
|
- | - | $252 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $48,699 | $25,866 |
$5,666
175,850
kWh
|
$1,448
-
kW-mo/yr
|
- | - | $41,585 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $819 | $700 |
$216
6,741
kWh
|
$39
-
kW-mo/yr
|
- | $326 | $238 | |
04 | 2.7135: Install occupancy sensors | $873 | $651 |
$873
26,964
kWh
|
- | - | - | - | |
05 | 2.7124: Make a practice of turning off lights when not needed | $142 | $54 |
$127
4,103
kWh
|
$15
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $581 | $375 |
$581
18,171
kWh
|
- | - | - | - | |
07 | 2.1241: Reduce excessive boiler blowdown | $1,324 | $5,000 | - | - |
$1,324
-
MMBtu
|
- | - | |
08 | 2.2511: Insulate bare equipment | $193 | $209 |
$193
11,137
kWh
|
- | - | - | - | |
09 | 2.7241: Install outside air damper / economizer on hvac unit | $1,072 | $7,000 |
$1,072
33,411
kWh
|
- | - | - | - | |
10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,474 | $6,000 | - |
$1,474
-
kW-mo/yr
|
- | - | - | |
11 | 2.4131: Size electric motors for peak operating efficiency | $3,909 | $15,000 |
$3,909
121,336
kWh
|
- | - | - | - | |
12 | 4.611: Begin a practice of predictive / preventative maintenance | $1,291 | $3,000 | - | - | - | - | $1,291 | |
TOTAL RECOMMENDED | $64,874 | $90,602 |
$15,487
486,224
kWh
|
$4,371
-
kW-mo/yr
|
$1,324
-
MMBtu
|
$326 | $43,366 | ||
TOTAL IMPLEMENTED | $8,429 | $33,736 |
$4,840
155,627
kWh
|
$1,449
-
kW-mo/yr
|
$1,324
-
MMBtu
|
$326 | $490 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs