ITAC Assessment: OK0552
ITAC logo
ITAC Assessment: OK0552
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Large Aircraft spare parts
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range n/a
# of Employees 325
Plant Area 130,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $331,193 7,598,476
kWh
Electricity Demand $1,506 -
Natural Gas $54,748 10,388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,497 $26,747 $2,850
88,511
kWh
$1,395
-
kW-mo/yr
- - $252
02 2.7142: Utilize higher efficiency lamps and/or ballasts $48,699 $25,866 $5,666
175,850
kWh
$1,448
-
kW-mo/yr
- - $41,585
03 2.7142: Utilize higher efficiency lamps and/or ballasts $819 $700 $216
6,741
kWh
$39
-
kW-mo/yr
- $326 $238
04 2.7135: Install occupancy sensors $873 $651 $873
26,964
kWh
- - - -
05 2.7124: Make a practice of turning off lights when not needed $142 $54 $127
4,103
kWh
$15
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $581 $375 $581
18,171
kWh
- - - -
07 2.1241: Reduce excessive boiler blowdown $1,324 $5,000 - - $1,324
-
MMBtu
- -
08 2.2511: Insulate bare equipment $193 $209 $193
11,137
kWh
- - - -
09 2.7241: Install outside air damper / economizer on hvac unit $1,072 $7,000 $1,072
33,411
kWh
- - - -
10 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,474 $6,000 - $1,474
-
kW-mo/yr
- - -
11 2.4131: Size electric motors for peak operating efficiency $3,909 $15,000 $3,909
121,336
kWh
- - - -
12 4.611: Begin a practice of predictive / preventative maintenance $1,291 $3,000 - - - - $1,291
TOTAL RECOMMENDED $64,874 $90,602 $15,487
486,224
kWh
$4,371
-
kW-mo/yr
$1,324
-
MMBtu
$326 $43,366
TOTAL IMPLEMENTED $8,429 $33,736 $4,840
155,627
kWh
$1,449
-
kW-mo/yr
$1,324
-
MMBtu
$326 $490
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs