ITAC Assessment: GT0370
ITAC logo
ITAC Assessment: GT0370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CAKES & DONUTS
NAICS
n/a
SIC 2053: Frozen Bakery Products, Except Bread
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 32,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $339,522 7,973,916
kWh
Natural Gas $242,070 44,808
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $123,683 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $116,338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,594 $3,680 $1,594
37,515
kWh
- -
02 2.4133: Use most efficient type of electric motors $1,724 $1,820 $1,724
40,445
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $287 - $287
6,741
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $7,345 $9,150 - $7,345
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $298 $84 - $298
-
MMBtu
-
06 2.2135: Repair and eliminate steam leaks $2,278 $200 - $2,278
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $415 $150 $415
9,672
kWh
- -
08 2.8114: Change rate schedules or other changes in utility service $109,742 $128,000 - $114,330
-
MMBtu
$(-4,588.0)
-
MMBtu
TOTAL RECOMMENDED $123,683 $143,084 $4,020
94,373
kWh
$124,251
-
MMBtu
$(-4,588.0)
-
MMBtu
TOTAL IMPLEMENTED $116,338 $133,934 $4,020
94,373
kWh
$116,906
-
MMBtu
$(-4,588.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs