Assessment Year | 1989 |
---|---|
Principal Product | CAKES & DONUTS |
NAICS |
n/a
|
SIC | 2053: Frozen Bakery Products, Except Bread |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
n/a
|
Annual Production | 32,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $339,522 | 7,973,916 |
kWh
|
$0.043 |
Natural Gas | $242,070 | 44,808 |
MMBtu
|
$5.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $123,683 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $116,338 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,594 | $3,680 |
$1,594
37,515
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,724 | $1,820 |
$1,724
40,445
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $287 | - |
$287
6,741
kWh
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $7,345 | $9,150 | - |
$7,345
-
MMBtu
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $298 | $84 | - |
$298
-
MMBtu
|
- | |
06 | 2.2135: Repair and eliminate steam leaks | $2,278 | $200 | - |
$2,278
-
MMBtu
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $415 | $150 |
$415
9,672
kWh
|
- | - | |
08 | 2.8114: Change rate schedules or other changes in utility service | $109,742 | $128,000 | - |
$114,330
-
MMBtu
|
$(-4,588.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $123,683 | $143,084 |
$4,020
94,373
kWh
|
$124,251
-
MMBtu
|
$(-4,588.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $116,338 | $133,934 |
$4,020
94,373
kWh
|
$116,906
-
MMBtu
|
$(-4,588.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs