ITAC Assessment: GT0369
ITAC logo
ITAC Assessment: GT0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SOFT CANDY
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $1
M
to 5
M
# of Employees 48
Plant Area
n/a
Annual Production 2,500,000
lb
Production Hrs. Annual 2,550
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,359 750,000
kWh
Natural Gas $11,102 1,966
MMBtu
Fuel Oil #2 $17,121 4,900
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4133: Use most efficient type of electric motors $184 $108 $184
2,345
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $943 $580 $943
11,723
kWh
- -
03 2.2136: Install / repair insulation on steam lines $498 $765 - - $498
-
MMBtu
04 2.2511: Insulate bare equipment $1,950 $2,670 - $1,950
-
MMBtu
-
05 2.6232: Install set-back timers $165 $280 $165
2,052
kWh
- -
TOTAL RECOMMENDED $3,740 $4,403 $1,292
16,120
kWh
$1,950
-
MMBtu
$498
-
MMBtu
TOTAL IMPLEMENTED $682 $873 $184
2,345
kWh
- $498
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs