ITAC Assessment: GT0361
ITAC logo
ITAC Assessment: GT0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product INDUSTRIAL SHELVES
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area
n/a
Annual Production 3,600
ton
Production Hrs. Annual 2,040
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,188 784,291
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,862 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $530 $50 $530
5,862
kWh
02 2.2511: Insulate bare equipment $7,330 $2,140 $7,330
82,356
kWh
03 2.2531: Re-size charging openings or add movable cover or door $260 $450 $260
2,931
kWh
04 2.2212: Use minimum safe oven ventilation $2,080 $250 $2,080
23,447
kWh
05 2.4133: Use most efficient type of electric motors $202 $518 $202
2,345
kWh
06 2.2437: Recover waste heat from equipment $2,460 $2,000 $2,460
27,843
kWh
TOTAL RECOMMENDED $12,862 $5,408 $12,862
144,784
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs