Assessment Year | 1988 |
---|---|
Principal Product | MOLDED RUBBER PRODUCTS |
NAICS |
n/a
|
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
n/a
|
Annual Production | 6,500,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $145,868 | 3,788,980 |
kWh
|
$0.038 |
Natural Gas | $109,499 | 27,992 |
MMBtu
|
$3.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,553 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,423 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,149 | $1,601 |
$1,149
32,239
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,940 | $14,890 |
$4,940
128,370
kWh
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,830 | $500 | - |
$1,830
-
MMBtu
|
|
04 | 2.2414: Use waste heat from hot flue gases to preheat | $2,630 | $12,500 | - |
$2,630
-
MMBtu
|
|
05 | 2.2122: Install / repair insulation on condensate lines | $1,050 | $1,765 | - |
$1,050
-
MMBtu
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $184 | $175 |
$184
4,689
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $500 | $450 |
$500
13,189
kWh
|
- | |
08 | 2.4239: Eliminate or reduce compressed air usage | $6,270 | $3,100 |
$6,270
162,954
kWh
|
- | |
TOTAL RECOMMENDED | $18,553 | $34,981 |
$13,043
341,441
kWh
|
$5,510
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,423 | $22,031 |
$12,543
328,252
kWh
|
$2,880
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs