ITAC Assessment: GT0358
ITAC logo
ITAC Assessment: GT0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MOLDED RUBBER PRODUCTS
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 6,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,868 3,788,980
kWh
Natural Gas $109,499 27,992
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,553 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,423

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,149 $1,601 $1,149
32,239
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,940 $14,890 $4,940
128,370
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,830 $500 - $1,830
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $2,630 $12,500 - $2,630
-
MMBtu
05 2.2122: Install / repair insulation on condensate lines $1,050 $1,765 - $1,050
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $184 $175 $184
4,689
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $500 $450 $500
13,189
kWh
-
08 2.4239: Eliminate or reduce compressed air usage $6,270 $3,100 $6,270
162,954
kWh
-
TOTAL RECOMMENDED $18,553 $34,981 $13,043
341,441
kWh
$5,510
-
MMBtu
TOTAL IMPLEMENTED $15,423 $22,031 $12,543
328,252
kWh
$2,880
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs