| Assessment Year | 1988 |
|---|---|
| Principal Product | MOLDED RUBBER PRODUCTS |
| NAICS |
n/a
|
| SIC | 3053: Gaskets, Packing, and Sealing Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 175 |
| Plant Area |
n/a
|
| Annual Production | 6,500,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $145,868 | 3,788,980 |
kWh
|
$0.038 |
| Natural Gas | $109,499 | 27,992 |
MMBtu
|
$3.91 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,553 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,423 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,149 | $1,601 |
$1,149
32,239
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,940 | $14,890 |
$4,940
128,370
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,830 | $500 | - |
$1,830
-
MMBtu
|
|
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $2,630 | $12,500 | - |
$2,630
-
MMBtu
|
|
| 05 | 2.2122: Install / repair insulation on condensate lines | $1,050 | $1,765 | - |
$1,050
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $184 | $175 |
$184
4,689
kWh
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $500 | $450 |
$500
13,189
kWh
|
- | |
| 08 | 2.4239: Eliminate or reduce compressed air usage | $6,270 | $3,100 |
$6,270
162,954
kWh
|
- | |
| TOTAL RECOMMENDED | $18,553 | $34,981 |
$13,043
341,441
kWh
|
$5,510
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $15,423 | $22,031 |
$12,543
328,252
kWh
|
$2,880
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs