Assessment Year 2021
Principal Product Wastewater treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area 186,605
ft2
Annual Production 162,060
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,155 452,577
kWh
Electricity Demand $8,745 1,443
kW-mo/yr
Electricity Fees $252 -
Natural Gas $612 54
MMBtu
Waste Disposal Costs
Water Usage $5 1
Tgal
TOTAL YEARLY COSTS $36,769
RECOMMENDED SAVINGS* $12,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $471

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 3.5311: Recover and reuse waste material $10,400 - - - $10,400
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,775 $3,987 $1,775
29,580
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $425 $629 $407
6,789
kWh
$18
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $46 $162 $34
563
kWh
$12
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,646 $4,778 $2,216
36,932
kWh
$30
-
kW-mo/yr
$10,400
TOTAL IMPLEMENTED $471 $791 $441
7,352
kWh
$30
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs