ITAC Assessment: NC0042
ITAC logo
ITAC Assessment: NC0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Knit Sportswear
NAICS
n/a
SIC 2329: Men's and Boys' Clothing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 235
Plant Area 54,000
ft2
Annual Production 1,800,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,114 796,600
kWh
Natural Gas $2,786 454
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,408 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,456

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,878 $5,000 $12,683
160,610
kWh
$(-4,805.0)
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $717 $2,000 $717
3,517
kWh
-
03 2.2122: Install / repair insulation on condensate lines $176 $45 $176
2,345
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,578 $16,665 $5,578
70,633
kWh
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $505 $825 $79
879
kWh
$426
-
MMBtu
06 2.4133: Use most efficient type of electric motors $5,554 $3,330 $5,554
70,340
kWh
-
TOTAL RECOMMENDED $20,408 $27,865 $24,787
308,324
kWh
$(-4,379.0)
-
MMBtu
TOTAL IMPLEMENTED $13,456 $21,665 $18,261
231,243
kWh
$(-4,805.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs