Assessment Year | 2013 |
---|---|
Principal Product | Resin and Plastic Coated Fabrics |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2295: Coated Fabrics, Not Rubberized |
Sales Range | $50 M to 100M |
# of Employees | 50 |
Plant Area |
120,000
ft2
|
Annual Production | 9,999,999
units
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $259,705 | 2,330,800 |
kWh
|
$0.11 |
Natural Gas | $329,288 | 36,278 |
MMBtu
|
$9.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $97,957 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,845 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $16,300 | $10,000 | - |
$16,300
-
MMBtu
|
|
02 | 2.7261: Install timers and/or thermostats | $5,700 | $20 | - |
$5,700
-
MMBtu
|
|
03 | 2.7314: Reduce ventilation air | $2,320 | $100 |
$2,320
20,910
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,766 | $11,200 |
$11,766
106,000
kWh
|
- | |
05 | 2.7314: Reduce ventilation air | $11,206 | $100 |
$1,400
12,600
kWh
|
$9,806
-
MMBtu
|
|
06 | 2.2135: Repair and eliminate steam leaks | $3,323 | $4,000 | - |
$3,323
-
MMBtu
|
|
07 | 2.2437: Recover waste heat from equipment | $25,430 | $24,500 |
$(-1,610.0)
(-14,500)
kWh
|
$27,040
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,226 | $12,000 |
$4,226
38,076
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,087 | $22,969 |
$2,087
18,803
kWh
|
- | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,316 | $8,800 |
$6,316
56,900
kWh
|
- | |
11 | 2.7311: Ventilation system to shut off when room is not in use | $1,741 | $800 |
$777
7,000
kWh
|
$964
-
MMBtu
|
|
12 | 2.2511: Insulate bare equipment | $596 | $500 |
$596
5,371
kWh
|
- | |
13 | 2.7243: Improve air circulation with destratification fans / other methods | $6,946 | $5,250 | - |
$6,946
-
MMBtu
|
|
TOTAL RECOMMENDED | $97,957 | $100,239 |
$27,878
251,160
kWh
|
$70,079
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,845 | $16,520 |
$4,822
43,447
kWh
|
$9,023
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs