ITAC Assessment: GT0351
ITAC logo
ITAC Assessment: GT0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MOLDED POLYSTRENE PRODUCTS
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $500
k
to 1
M
# of Employees 8
Plant Area
n/a
Annual Production 378,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,841 344,959
kWh
Natural Gas $15,326 4,096
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $600 - $600
6,448
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $373 $2,000 $373
3,810
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $36 $25 $36
293
kWh
- -
04 2.2437: Recover waste heat from equipment $920 $540 - $920
-
MMBtu
-
05 2.2441: Preheat boiler makeup water with waste process heat $1,560 $4,190 - $1,560
-
MMBtu
-
06 2.2692: Use outside cold water source as a supply of cooling water $690 $300 $990
10,258
kWh
- $(-300.0)
TOTAL RECOMMENDED $4,179 $7,055 $1,999
20,809
kWh
$2,480
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs