ITAC Assessment: GT0350
ITAC logo
ITAC Assessment: GT0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BASE CHEMICALS
NAICS
n/a
SIC 2843: Surface Active Agents, Finishing Agents, Sulfonated Oils, and Assistants
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 21,800,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,473 1,626,026
kWh
Natural Gas $90,447 25,281
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.5194: Redesign process $20,803 $89,500 - $803
-
MMBtu
$20,000
02 2.2514: Cover open tanks $610 $2,280 - $610
-
MMBtu
-
03 2.2511: Insulate bare equipment $2,140 $1,730 - $2,140
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $4,300 $9,000 - $4,300
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $280 $100 - $280
-
MMBtu
-
06 2.6232: Install set-back timers $1,090 - $1,090
16,120
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,194 $1,680 $1,194
17,878
kWh
- -
TOTAL RECOMMENDED $30,417 $104,290 $2,284
33,998
kWh
$8,133
-
MMBtu
$20,000
TOTAL IMPLEMENTED $29,807 $102,010 $2,284
33,998
kWh
$7,523
-
MMBtu
$20,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs