Assessment Year | 1988 |
---|---|
Principal Product | BASE CHEMICALS |
NAICS |
n/a
|
SIC | 2843: Surface Active Agents, Finishing Agents, Sulfonated Oils, and Assistants |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
n/a
|
Annual Production | 21,800,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,473 | 1,626,026 |
kWh
|
$0.067 |
Natural Gas | $90,447 | 25,281 |
MMBtu
|
$3.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,417 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,807 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.5194: Redesign process | $20,803 | $89,500 | - |
$803
-
MMBtu
|
$20,000 | |
02 | 2.2514: Cover open tanks | $610 | $2,280 | - |
$610
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $2,140 | $1,730 | - |
$2,140
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,300 | $9,000 | - |
$4,300
-
MMBtu
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $280 | $100 | - |
$280
-
MMBtu
|
- | |
06 | 2.6232: Install set-back timers | $1,090 | - |
$1,090
16,120
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,194 | $1,680 |
$1,194
17,878
kWh
|
- | - | |
TOTAL RECOMMENDED | $30,417 | $104,290 |
$2,284
33,998
kWh
|
$8,133
-
MMBtu
|
$20,000 | ||
TOTAL IMPLEMENTED | $29,807 | $102,010 |
$2,284
33,998
kWh
|
$7,523
-
MMBtu
|
$20,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs