Assessment Year | 1988 |
---|---|
Principal Product | INJECTION MOLDINGS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 173 |
Plant Area |
n/a
|
Annual Production | 7,800,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $163,654 | 4,364,889 |
kWh
|
$0.037 |
Natural Gas | $44,959 | 7,990 |
MMBtu
|
$5.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,118 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $37,911 | $21,000 |
$9,968
265,826
kWh
|
$27,943
-
MMBtu
|
|
02 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $2,970 | $2,830 |
$(-402.0)
(-10,844)
kWh
|
$3,372
-
MMBtu
|
|
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,230 | $2,600 | - |
$1,230
-
MMBtu
|
|
04 | 2.7212: Install or upgrade insulation on hvac distribution systems | $90 | $35 | - |
$90
-
MMBtu
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $140 | - |
$140
3,810
kWh
|
- | |
06 | 2.2531: Re-size charging openings or add movable cover or door | $7,280 | $1,200 |
$7,280
194,314
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,772 | $8,751 |
$3,772
100,528
kWh
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $725 | $5,250 |
$725
19,343
kWh
|
- | |
TOTAL RECOMMENDED | $54,118 | $41,666 |
$21,483
572,977
kWh
|
$32,635
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs