ITAC Assessment: GT0343
ITAC logo
ITAC Assessment: GT0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PANELIZED HOUSING UNITS
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 1,450
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,266 1,169,109
kWh
Natural Gas $8,767 1,418
MMBtu
Fuel Oil #1 $7,087 938
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $10,269 - $10,269
-
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,063 $6,645 $2,325
29,015
kWh
- $(-262.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,010 $1,800 $2,010
31,360
kWh
- -
04 2.7261: Install timers and/or thermostats $178 $76 $85
3,517
kWh
$93
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $14 $25 $14
293
kWh
- -
TOTAL RECOMMENDED $14,534 $8,546 $14,703
64,185
kWh
$93
-
MMBtu
$(-262.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs