ITAC Assessment: GT0335
ITAC logo
ITAC Assessment: GT0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MOLDED PLASTIC COMPONENTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 50,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,099 4,050,117
kWh
Natural Gas $10,137 1,767
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $5,710 $1,200 $5,710
-
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,561 $6,000 $11,561
210,727
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $460 $1,000 - $460
-
MMBtu
04 2.2443: Re-use or recycle hot or cold process exhaust air $1,000 $2,900 - $1,000
-
MMBtu
05 2.2437: Recover waste heat from equipment $1,830 $8,000 - $1,830
-
MMBtu
06 2.4133: Use most efficient type of electric motors $845 $5,130 $845
15,533
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,070 - $1,070
19,343
kWh
-
TOTAL RECOMMENDED $22,476 $24,230 $19,186
245,603
kWh
$3,290
-
MMBtu
TOTAL IMPLEMENTED $19,646 $13,330 $19,186
245,603
kWh
$460
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs