ITAC Assessment: GT0333
ITAC logo
ITAC Assessment: GT0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product WINDOW COVERINGS
NAICS
n/a
SIC 2591: Drapery Hardware and Window Blinds and Shades
Sales Range $10
M
to 50
M
# of Employees 550
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $265,375 5,370,750
kWh
Natural Gas $91,390 24,140
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,615 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,602

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6232: Install set-back timers $6,040 $500 $6,040
122,216
kWh
- -
02 2.7261: Install timers and/or thermostats $7,210 $500 $7,210
145,955
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $840 - - $1,440
-
MMBtu
$(-600.0)
04 2.2511: Insulate bare equipment $1,665 $3,190 - $1,665
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,150 $4,980 $2,150
43,376
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $348 $700 $348
7,034
kWh
- -
07 2.4133: Use most efficient type of electric motors $362 $1,061 $362
7,327
kWh
- -
TOTAL RECOMMENDED $18,615 $10,931 $16,110
325,908
kWh
$3,105
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $16,602 $7,041 $15,762
318,874
kWh
$1,440
-
MMBtu
$(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs