Assessment Year | 1987 |
---|---|
Principal Product | CAST-IRON POTS & PANS |
NAICS |
n/a
|
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $1 M to 5M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 10,200
ton
|
Production Hrs. Annual | 1,870
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $332,990 | 4,411,196 |
kWh
|
$0.075 |
Natural Gas | $170,867 | 32,996 |
MMBtu
|
$5.18 |
Coal | $290,012 | 59,464 |
MMBtu
|
$4.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $114,914 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $357 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,150 | $1,000 |
$1,150
15,240
kWh
|
- | |
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $5,456 | $1,000 |
$5,456
72,392
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $756 | $300 |
$756
9,965
kWh
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $21,756 | $30,000 | - |
$21,756
-
MMBtu
|
|
05 | 2.2414: Use waste heat from hot flue gases to preheat | $81,476 | $57,000 | - |
$81,476
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $1,160 | $1,500 | - |
$1,160
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $357 | $1,282 |
$357
4,689
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,803 | $7,775 |
$2,803
37,222
kWh
|
- | |
TOTAL RECOMMENDED | $114,914 | $99,857 |
$10,522
139,508
kWh
|
$104,392
-
MMBtu
|
||
TOTAL IMPLEMENTED | $357 | $1,282 |
$357
4,689
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs