ITAC Assessment: GT0315
ITAC logo
ITAC Assessment: GT0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product RECLAIMED TEXTILE SCRAPS
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 46
Plant Area
n/a
Annual Production 14,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,150 4,000,879
kWh
Natural Gas $11,074 1,876
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,091

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $230 $200 $230
3,517
kWh
-
02 2.7245: Use direct air supply to exhaust hoods $9,270 $13,000 $6,090
93,200
kWh
$3,180
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $481 - $481
7,327
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,340 $5,150 $2,340
35,756
kWh
-
05 2.4133: Use most efficient type of electric motors $1,018 $3,783 $1,018
15,533
kWh
-
TOTAL RECOMMENDED $13,339 $22,133 $10,159
155,333
kWh
$3,180
-
MMBtu
TOTAL IMPLEMENTED $12,091 $18,150 $8,911
136,283
kWh
$3,180
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs