Assessment Year | 2013 |
---|---|
Principal Product | Carbonated beverages |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
524,000
ft2
|
Annual Production | 25,000,000
pieces
|
Production Hrs. Annual | 8,616
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $801,268 | 14,848,176 |
kWh
|
$0.054 |
Electricity Demand | $270,540 | 29,904 |
kW-mo/yr
|
$9.05 |
Electricity Fees | $14,085 | - |
|
- |
Natural Gas | $216,091 | 38,902 |
MMBtu
|
$5.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $152,944 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $148,024 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $81,000 | $40,000 |
$106,000
2,150,000
kWh
|
$23,000
-
kW-mo/yr
|
$(-48,000.0)
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $45,620 | $50,000 | - | - |
$45,620
-
MMBtu
|
|
03 | 2.4133: Use most efficient type of electric motors | $8,894 | $31,100 |
$7,270
148,350
kWh
|
$1,624
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $4,800 | $1,800 |
$3,840
79,200
kWh
|
$960
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,130 | $610 |
$3,270
66,800
kWh
|
$860
-
kW-mo/yr
|
- | |
06 | 2.6218: Turn off equipment when not in use | $3,580 | $500 |
$3,580
73,000
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,940 | $220 |
$2,400
49,000
kWh
|
$540
-
kW-mo/yr
|
- | |
08 | 2.4314: Use synthetic lubricant | $1,980 | - |
$1,620
33,000
kWh
|
$360
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $152,944 | $124,230 |
$127,980
2,599,350
kWh
|
$27,344
-
kW-mo/yr
|
$(-2,380.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $148,024 | $124,010 |
$123,960
2,517,350
kWh
|
$26,444
-
kW-mo/yr
|
$(-2,380.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |