ITAC Assessment: GT0275
ITAC logo
ITAC Assessment: GT0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MENS'DRESS SHIRTS
NAICS
n/a
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 2,940,000
pieces
Production Hrs. Annual 4,190
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,250 2,606,096
kWh
Natural Gas $3,601 565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,089

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6232: Install set-back timers $1,780 - $1,780
75,615
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,112 $840 $2,112
37,808
kWh
03 2.4133: Use most efficient type of electric motors $197 $217 $197
3,517
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,210 $45,000 $13,210
235,932
kWh
TOTAL RECOMMENDED $17,299 $46,057 $17,299
352,872
kWh
TOTAL IMPLEMENTED $4,089 $1,057 $4,089
116,940
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs