| Assessment Year | 1985 |
|---|---|
| Principal Product | COATED FABRICS |
| NAICS |
n/a
|
| SIC | 2211: Broadwoven Fabric Mills, Cotton |
| Sales Range | $1 M to 5M |
| # of Employees | 73 |
| Plant Area |
n/a
|
| Annual Production | 26,220
thousand feet
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $84,551 | 1,148,300 |
kWh
|
$0.074 |
| LPG | $401,793 | 70,503 |
MMBtu
|
$5.70 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $59,137 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,953 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $16,256 | $9,655 | - |
$16,256
-
MMBtu
|
|
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,036 | $10,000 | - |
$8,036
-
MMBtu
|
|
| 03 | 2.2122: Install / repair insulation on condensate lines | $912 | $980 | - |
$912
-
MMBtu
|
|
| 04 | 2.2511: Insulate bare equipment | $1,824 | $3,150 | - |
$1,824
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $195 | $200 |
$195
2,638
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,003 | $1,186 |
$1,003
13,482
kWh
|
- | |
| 07 | 2.4133: Use most efficient type of electric motors | $730 | $727 |
$730
9,965
kWh
|
- | |
| 08 | 2.2511: Insulate bare equipment | $25,166 | $83,600 | - |
$25,166
-
MMBtu
|
|
| 09 | 2.3191: Use demand controller or load shedder | $5,015 | $22,000 |
$5,015
-
kWh
|
- | |
| TOTAL RECOMMENDED | $59,137 | $131,498 |
$6,943
26,085
kWh
|
$52,194
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $27,953 | $24,712 |
$925
12,603
kWh
|
$27,028
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs