ITAC Assessment: GT0270
ITAC logo
ITAC Assessment: GT0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product COATED FABRICS
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $1
M
to 5
M
# of Employees 73
Plant Area
n/a
Annual Production 26,220
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,551 1,148,300
kWh
LPG $401,793 70,503
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,137 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,953

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.2136: Install / repair insulation on steam lines $16,256 $9,655 - $16,256
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $8,036 $10,000 - $8,036
-
MMBtu
03 2.2122: Install / repair insulation on condensate lines $912 $980 - $912
-
MMBtu
04 2.2511: Insulate bare equipment $1,824 $3,150 - $1,824
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $195 $200 $195
2,638
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,003 $1,186 $1,003
13,482
kWh
-
07 2.4133: Use most efficient type of electric motors $730 $727 $730
9,965
kWh
-
08 2.2511: Insulate bare equipment $25,166 $83,600 - $25,166
-
MMBtu
09 2.3191: Use demand controller or load shedder $5,015 $22,000 $5,015
-
kWh
-
TOTAL RECOMMENDED $59,137 $131,498 $6,943
26,085
kWh
$52,194
-
MMBtu
TOTAL IMPLEMENTED $27,953 $24,712 $925
12,603
kWh
$27,028
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs