ITAC Assessment: LM0002
ITAC logo
ITAC Assessment: LM0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product magnets
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 45,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 2,808
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,129 613,400
kWh
Electricity Demand $13,332 2,472
kW-mo/yr
Electricity Fees $16,159 -
Natural Gas $5,385 731
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $243,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $130,261

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,192 $3,285 $3,882
47,673
kWh
$1,310
-
kW-mo/yr
- - -
02 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,259 $3,158 $821
9,950
kWh
$438
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,253 $250 $830
10,056
kWh
$423
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $508 - $253
3,068
kWh
$255
-
kW-mo/yr
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,282 $12,475 - - $6,282
-
lb
- -
06 3.7197: Use ultrasonic cleaning $100,100 $90,000 - - - $100,100 -
07 4.611: Begin a practice of predictive / preventative maintenance $128,500 - - - - $(-87,500.0) $216,000
TOTAL RECOMMENDED $243,094 $109,168 $5,786
70,747
kWh
$2,426
-
kW-mo/yr
$6,282
-
lb
$12,600 $216,000
TOTAL IMPLEMENTED $130,261 $250 $1,083
13,124
kWh
$678
-
kW-mo/yr
- $(-87,500.0) $216,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs