Assessment Year | 2001 |
---|---|
Principal Product | magnets |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
45,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 2,808
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $76,129 | 613,400 |
kWh
|
$0.12 |
Electricity Demand | $13,332 | 2,472 |
kW-mo/yr
|
$5.39 |
Electricity Fees | $16,159 | - |
|
- |
Natural Gas | $5,385 | 731 |
MMBtu
|
$7.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $243,094 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $130,261 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,192 | $3,285 |
$3,882
47,673
kWh
|
$1,310
-
kW-mo/yr
|
- | - | - | |
02 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $1,259 | $3,158 |
$821
9,950
kWh
|
$438
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,253 | $250 |
$830
10,056
kWh
|
$423
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $508 | - |
$253
3,068
kWh
|
$255
-
kW-mo/yr
|
- | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,282 | $12,475 | - | - |
$6,282
-
lb
|
- | - | |
06 | 3.7197: Use ultrasonic cleaning | $100,100 | $90,000 | - | - | - | $100,100 | - | |
07 | 4.611: Begin a practice of predictive / preventative maintenance | $128,500 | - | - | - | - | $(-87,500.0) | $216,000 | |
TOTAL RECOMMENDED | $243,094 | $109,168 |
$5,786
70,747
kWh
|
$2,426
-
kW-mo/yr
|
$6,282
-
lb
|
$12,600 | $216,000 | ||
TOTAL IMPLEMENTED | $130,261 | $250 |
$1,083
13,124
kWh
|
$678
-
kW-mo/yr
|
- | $(-87,500.0) | $216,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs