ITAC Assessment: GT0268
ITAC logo
ITAC Assessment: GT0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SHOES
NAICS
n/a
SIC 3021: Rubber and Plastics Footwear
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area
n/a
Annual Production 350,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,715 227,726
kWh
Natural Gas $924 138
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $561 $1,254 $561
9,965
kWh
02 2.4133: Use most efficient type of electric motors $7 - $7
293
kWh
03 2.7251: Reduce air conditioning load by evaporating water from roof $480 $4,250 $480
8,499
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $605 $150 $605
10,844
kWh
TOTAL RECOMMENDED $1,653 $5,654 $1,653
29,601
kWh
TOTAL IMPLEMENTED $605 $150 $605
10,844
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs