ITAC Assessment: GT0267
ITAC logo
ITAC Assessment: GT0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product HYDRAULIC VALVES,PUMPS
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 17,650
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,640 3,271,981
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7243: Improve air circulation with destratification fans / other methods $2,275 $3,300 $2,275
39,566
kWh
-
02 2.7251: Reduce air conditioning load by evaporating water from roof $1,200 $16,250 $2,200
38,101
kWh
$(-1,000.0)
03 2.2514: Cover open tanks $3,200 $600 $3,200
55,686
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,640 $450 $3,640
63,013
kWh
-
05 2.4133: Use most efficient type of electric motors $3,968 $3,547 $3,968
69,168
kWh
-
06 2.7229: Air condition only space necessary $1,860 $1,000 $1,860
32,239
kWh
-
TOTAL RECOMMENDED $16,143 $25,147 $17,143
297,773
kWh
$(-1,000.0)
TOTAL IMPLEMENTED $8,700 $2,050 $8,700
150,938
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs