Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Fluid milk products
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 159
Plant Area 110,000
ft2
Annual Production 17,400
Tgal
Production Hrs. Annual 4,888
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,823 7,102,439
kWh
Electricity Demand $217,856 20,172
kW-mo/yr
Electricity Fees $1,942 -
Natural Gas $84,612 9,551
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,311 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,411

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $6,850 $15,000 - - $6,850
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,420 $180 $4,470
105,900
kWh
$1,950
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,160 $3,230 $1,960
46,400
kWh
$1,200
-
kW-mo/yr
- - -
04 2.6218: Turn off equipment when not in use $1,120 - $370
8,700
kWh
$750
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $142 $194 $58
1,387
kWh
$84
-
kW-mo/yr
- - -
06 2.9111: Use solar heat to heat make-up air $3,460 $29,620 - - $3,460
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,720 $3,590 $1,480
34,900
kWh
$1,120
-
kW-mo/yr
- $70 $50
08 2.9114: Use solar heat to make electricty $1,430 $2,950 $600
14,100
kWh
$830
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $719 $110 $498
11,794
kWh
$265
-
kW-mo/yr
- - $(-44.0)
10 2.7447: Install vinyl strip / high speed / air curtain doors $290 $200 $290
6,900
kWh
- - - -
TOTAL RECOMMENDED $26,311 $55,074 $9,726
230,081
kWh
$6,199
-
kW-mo/yr
$10,310
-
MMBtu
$70 $6
TOTAL IMPLEMENTED $11,411 $4,274 $7,166
169,581
kWh
$4,169
-
kW-mo/yr
- $70 $6
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings