ITAC Assessment: GT0262
ITAC logo
ITAC Assessment: GT0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SHEET METAL PRODUCTS
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 7,200
ton
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,921 798,945
kWh
Natural Gas $13,181 2,495
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,505

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,780 $500 $2,780
35,170
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $92 $27 $92
1,172
kWh
03 2.4133: Use most efficient type of electric motors $165 $168 $165
2,052
kWh
04 2.4221: Install compressor air intakes in coolest locations $468 $75 $468
6,155
kWh
TOTAL RECOMMENDED $3,505 $770 $3,505
44,549
kWh
TOTAL IMPLEMENTED $3,505 $770 $3,505
44,549
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs