ITAC Assessment: GT0256
ITAC logo
ITAC Assessment: GT0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product REFRACTORY CLAY
NAICS
n/a
SIC 3255: Clay Refractories
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 125,000
ton
Production Hrs. Annual 2,040
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,543 553,048
kWh
Natural Gas $76,452 15,340
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,559

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $329 $330 $329
2,931
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $195 $75 $195
1,758
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $970 $500 $970
8,206
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $709 - $709
5,862
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,330 $640 $1,330
11,137
kWh
-
06 2.2511: Insulate bare equipment $11,900 $9,650 - $11,900
-
MMBtu
07 2.2212: Use minimum safe oven ventilation $16,700 $1,000 - $16,700
-
MMBtu
TOTAL RECOMMENDED $32,133 $12,195 $3,533
29,894
kWh
$28,600
-
MMBtu
TOTAL IMPLEMENTED $13,559 $10,620 $1,659
14,068
kWh
$11,900
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs