ITAC Assessment: GT0246
ITAC logo
ITAC Assessment: GT0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SYNTHETIC FIBER DYEING
NAICS
n/a
SIC 2262: Finishers of Broadwoven Fabrics of Manmade Fiber and Silk
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 7,250,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,125 1,919,988
kWh
Natural Gas $313,057 66,441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $159,366 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,746

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Coal Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $24,720 $300 - $24,720
-
MMBtu
-
02 2.2444: Use hot process fluids to preheat incoming process fluids $50,893 $35,000 - $50,893
-
MMBtu
-
03 2.2441: Preheat boiler makeup water with waste process heat $1,682 $4,000 - $1,682
-
MMBtu
-
04 2.5192: Modify textile dryers $17,587 $23,000 - $17,587
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $577 $821 $577
10,551
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $449 $800 $449
8,206
kWh
- -
07 2.1331: Burn a less expensive grade of fuel $63,458 $120,000 - $113,266
-
MMBtu
$(-49,808.0)
-
MMBtu
TOTAL RECOMMENDED $159,366 $183,921 $1,026
18,757
kWh
$208,148
-
MMBtu
$(-49,808.0)
-
MMBtu
TOTAL IMPLEMENTED $25,746 $1,921 $1,026
18,757
kWh
$24,720
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs