Assessment Year | 1985 |
---|---|
Principal Product | SYNTHETIC FIBER DYEING |
NAICS |
n/a
|
SIC | 2262: Finishers of Broadwoven Fabrics of Manmade Fiber and Silk |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
n/a
|
Annual Production | 7,250,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,125 | 1,919,988 |
kWh
|
$0.055 |
Natural Gas | $313,057 | 66,441 |
MMBtu
|
$4.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $159,366 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,746 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Coal Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $24,720 | $300 | - |
$24,720
-
MMBtu
|
- | |
02 | 2.2444: Use hot process fluids to preheat incoming process fluids | $50,893 | $35,000 | - |
$50,893
-
MMBtu
|
- | |
03 | 2.2441: Preheat boiler makeup water with waste process heat | $1,682 | $4,000 | - |
$1,682
-
MMBtu
|
- | |
04 | 2.5192: Modify textile dryers | $17,587 | $23,000 | - |
$17,587
-
MMBtu
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $577 | $821 |
$577
10,551
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $449 | $800 |
$449
8,206
kWh
|
- | - | |
07 | 2.1331: Burn a less expensive grade of fuel | $63,458 | $120,000 | - |
$113,266
-
MMBtu
|
$(-49,808.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $159,366 | $183,921 |
$1,026
18,757
kWh
|
$208,148
-
MMBtu
|
$(-49,808.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,746 | $1,921 |
$1,026
18,757
kWh
|
$24,720
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Coal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs