ITAC Assessment: GT0245
ITAC logo
ITAC Assessment: GT0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product INDUSTRIAL MACHINERY
NAICS
n/a
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 50,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,353 1,783,998
kWh
Natural Gas $23,353 3,893
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,714 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $21,691 $6,000 $21,691
344,373
kWh
-
02 2.2447: Heat water with exhaust heat $4,044 $10,900 $(-2,334.0)
(-85,873)
kWh
$6,378
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $222 $300 $222
3,517
kWh
-
04 2.4133: Use most efficient type of electric motors $757 $1,495 $757
12,016
kWh
-
TOTAL RECOMMENDED $26,714 $18,695 $20,336
274,033
kWh
$6,378
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs