Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product window glass
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 7,950
thousand feet
Production Hrs. Annual 6,120
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $698,498 12,333,687
kWh
Electricity Demand $21,616 54,036
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,584

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $26,500 - $26,500
467,900
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,232 - $7,232
127,720
kWh
- -
03 2.6121: Reduce hot water temperature to the minimum required $6,232 $900 $6,232
110,058
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,086 $19,050 n/a $7,763
137,088
kWh
$323
-
kW-mo/yr
-
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,731 $1,800 $2,044
36,108
kWh
- $687
06 2.4133: Use most efficient type of electric motors $9,389 $26,990 $9,356
165,210
kWh
$33
-
kW-mo/yr
-
TOTAL RECOMMENDED $60,170 $48,740 $59,127
1,044,084
kWh
$356
-
kW-mo/yr
$687
TOTAL IMPLEMENTED $25,584 $29,690 $24,864
439,096
kWh
$33
-
kW-mo/yr
$687
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs