ITAC Assessment: GT0244
ITAC logo
ITAC Assessment: GT0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product HAND TOOLS,SOCKETS
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 1,800,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,244 5,390,094
kWh
Natural Gas $72,473 13,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $7,610 $732 $311
12,309
kWh
$1,488
-
MMBtu
$5,811
02 2.2449: Recover heat from exhausted steam, hot air or hot water $3,570 $6,500 - $3,570
-
MMBtu
-
03 2.2511: Insulate bare equipment $350 $300 - $350
-
MMBtu
-
04 2.2515: Use optimum thickness insulation $3,380 $1,000 $3,380
58,617
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,150 $2,000 $1,150
19,930
kWh
- -
TOTAL RECOMMENDED $16,060 $10,532 $4,841
90,856
kWh
$5,408
-
MMBtu
$5,811
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs