ITAC Assessment: GT0241
ITAC logo
ITAC Assessment: GT0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PLASTIC PIPE
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 36,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,742 7,063,013
kWh
Natural Gas $30,220 5,560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,079

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $4,960 $3,000 $4,960
-
kWh
-
02 2.4133: Use most efficient type of electric motors $453 $257 $453
9,965
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $12,400 $26,000 $12,400
275,498
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $836 $123 $836
18,464
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $8,430 $4,000 - $8,430
-
MMBtu
TOTAL RECOMMENDED $27,079 $33,380 $18,649
303,927
kWh
$8,430
-
MMBtu
TOTAL IMPLEMENTED $27,079 $33,380 $18,649
303,927
kWh
$8,430
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs