| Assessment Year | 1985 |
|---|---|
| Principal Product | PLASTIC PIPE |
| NAICS |
n/a
|
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 36,000,000
lb
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $319,742 | 7,063,013 |
kWh
|
$0.045 |
| Natural Gas | $30,220 | 5,560 |
MMBtu
|
$5.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,079 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,079 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3191: Use demand controller or load shedder | $4,960 | $3,000 |
$4,960
-
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $453 | $257 |
$453
9,965
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,400 | $26,000 |
$12,400
275,498
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $836 | $123 |
$836
18,464
kWh
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $8,430 | $4,000 | - |
$8,430
-
MMBtu
|
|
| TOTAL RECOMMENDED | $27,079 | $33,380 |
$18,649
303,927
kWh
|
$8,430
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $27,079 | $33,380 |
$18,649
303,927
kWh
|
$8,430
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs