ITAC Assessment: GT0240
ITAC logo
ITAC Assessment: GT0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MOLDED RUBBER PRODUCTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area
n/a
Annual Production 52,420,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,088 1,242,966
kWh
Natural Gas $4,373 725
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,363 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,363

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $360 $363 $360
8,206
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $170 $93 $170
4,103
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $453 $400 $453
10,551
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $180 $250 - $180
-
MMBtu
05 2.2212: Use minimum safe oven ventilation $780 - $780
18,171
kWh
-
06 2.3191: Use demand controller or load shedder $7,420 $5,000 $7,420
-
kWh
-
TOTAL RECOMMENDED $9,363 $6,106 $9,183
41,031
kWh
$180
-
MMBtu
TOTAL IMPLEMENTED $9,363 $6,106 $9,183
41,031
kWh
$180
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs