ITAC Assessment: TT0197
ITAC logo
ITAC Assessment: TT0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Bellows
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 104
Plant Area 35,000
ft2
Annual Production 250
units
Production Hrs. Annual 7,344
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,296 1,512,880
kWh
Electricity Demand $43,564 3,885
kW-mo/yr
Natural Gas $1,510 182
MMBtu
Waste Disposal Costs
Water Usage $1,072 333,000
Tgal
Water Disposal $1,568 333
Tgal
TOTAL YEARLY COSTS $145,010
RECOMMENDED SAVINGS* $71,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,640

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $19,976 $72,881 $19,976
271,981
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,919 $17,290 $9,320
144,947
kWh
$2,599
-
kW-mo/yr
- -
03 4.812: Apply for investment incentives $31,640 $150 - - $7,910 $23,730
04 2.3212: Optimize plant power factor $6,006 $10,000 - $6,006
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,267 $3,050 $2,267
35,251
kWh
- - -
TOTAL RECOMMENDED $71,808 $103,371 $31,563
452,179
kWh
$8,605
-
kW-mo/yr
$7,910 $23,730
TOTAL IMPLEMENTED $31,640 $150 - - $7,910 $23,730
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs