| Assessment Year | 1984 |
|---|---|
| Principal Product | SYNTHETIC CARPET YARN |
| NAICS |
n/a
|
| SIC | 2281: Yarn Spinning Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 450 |
| Plant Area |
n/a
|
| Annual Production | 16,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $484,137 | 12,550,117 |
kWh
|
$0.039 |
| Natural Gas | $281,726 | 57,500 |
MMBtu
|
$4.90 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $88,963 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $66,523 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $9,800 | $8,000 | - |
$9,800
-
MMBtu
|
|
| 02 | 2.2135: Repair and eliminate steam leaks | $1,000 | $100 | - |
$1,000
-
MMBtu
|
|
| 03 | 2.2444: Use hot process fluids to preheat incoming process fluids | $11,800 | $17,000 | - |
$11,800
-
MMBtu
|
|
| 04 | 2.1111: Control pressure on steamer operations | $54,023 | $16,000 | - |
$54,023
-
MMBtu
|
|
| 05 | 2.7226: Use computer programs to optimize hvac performance | $11,500 | $8,000 |
$11,500
296,014
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $840 | $1,000 |
$840
20,516
kWh
|
- | |
| TOTAL RECOMMENDED | $88,963 | $50,100 |
$12,340
316,530
kWh
|
$76,623
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $66,523 | $24,100 |
$11,500
296,014
kWh
|
$55,023
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs