| Assessment Year | 1984 |
|---|---|
| Principal Product | FLEXIBLE PACKAGING |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 6,000,000
lb
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $181,406 | 3,963,072 |
kWh
|
$0.046 |
| Natural Gas | $76,810 | 14,600 |
MMBtu
|
$5.26 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,785 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,071 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $6,010 | $2,400 | - |
$6,010
-
MMBtu
|
|
| 02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $795 | $1,000 | - |
$795
-
MMBtu
|
|
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,057 | $1,000 | - |
$1,057
-
MMBtu
|
|
| 04 | 2.2135: Repair and eliminate steam leaks | $575 | $50 | - |
$575
-
MMBtu
|
|
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $919 | $500 |
$919
-
kWh
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $645 | $368 |
$645
14,068
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,404 | $1,270 |
$1,404
30,774
kWh
|
- | |
| 08 | 2.6232: Install set-back timers | $330 | - |
$330
7,327
kWh
|
- | |
| 09 | 2.2511: Insulate bare equipment | $50 | $150 |
$50
1,172
kWh
|
- | |
| TOTAL RECOMMENDED | $11,785 | $6,738 |
$3,348
53,341
kWh
|
$8,437
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,071 | $5,238 |
$2,429
53,341
kWh
|
$7,642
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs