ITAC Assessment: GT0229
ITAC logo
ITAC Assessment: GT0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FLEXIBLE PACKAGING
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,406 3,963,072
kWh
Natural Gas $76,810 14,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,785 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,071

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $6,010 $2,400 - $6,010
-
MMBtu
02 2.2443: Re-use or recycle hot or cold process exhaust air $795 $1,000 - $795
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,057 $1,000 - $1,057
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $575 $50 - $575
-
MMBtu
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $919 $500 $919
-
kWh
-
06 2.4133: Use most efficient type of electric motors $645 $368 $645
14,068
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,404 $1,270 $1,404
30,774
kWh
-
08 2.6232: Install set-back timers $330 - $330
7,327
kWh
-
09 2.2511: Insulate bare equipment $50 $150 $50
1,172
kWh
-
TOTAL RECOMMENDED $11,785 $6,738 $3,348
53,341
kWh
$8,437
-
MMBtu
TOTAL IMPLEMENTED $10,071 $5,238 $2,429
53,341
kWh
$7,642
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs