ITAC Assessment: GT0224
ITAC logo
ITAC Assessment: GT0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product STAINLESS STEEL PRODUCTS
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $5
M
to 10
M
# of Employees 61
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,533 288,980
kWh
Natural Gas $12,807 2,370
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $390 $300 - $390
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $1,340 $2,300 $(-100.0)
(-2,052)
kWh
$1,440
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,510 $2,350 $1,510
17,878
kWh
-
04 2.7122: Disconnect ballasts $60 $50 $60
586
kWh
-
05 2.4133: Use most efficient type of electric motors $70 $149 $70
879
kWh
-
06 2.2711: Utilize outside air instead of conditioned air for drying $180 $350 - $180
-
MMBtu
07 2.2532: Use only amount of air necessary to prevent explosion hazard $1,190 $3,000 - $1,190
-
MMBtu
08 2.7492: Use proper thickness of insulation on building envelope $1,780 $11,625 - $1,780
-
MMBtu
TOTAL RECOMMENDED $6,520 $20,124 $1,540
17,291
kWh
$4,980
-
MMBtu
TOTAL IMPLEMENTED $2,030 $2,849 $1,640
19,343
kWh
$390
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs