ITAC Assessment: LE0165
ITAC logo
ITAC Assessment: LE0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Powdered Metals, Alloys, Minerals and Chemicals
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 100,000
ft2
Annual Production 12,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,693 2,071,200
kWh
Electricity Demand $79,061 6,572
kW-mo/yr
Natural Gas $80,770 9,839
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,438

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.2511: Insulate bare equipment $8,970 $1,440 - - $8,970
-
MMBtu
-
02 2.7135: Install occupancy sensors $2,288 $500 $2,288
31,425
kWh
- - -
03 2.7111: Reduce illumination to minimum necessary levels $5,356 $263 $4,027
47,861
kWh
$1,329
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $468 - - - - $468
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $498 - $498
6,845
kWh
- - -
06 2.2312: Minimize non-essential material in heat treatment process $3,608 $500 - - $3,608
-
MMBtu
-
TOTAL RECOMMENDED $21,188 $2,703 $6,813
86,131
kWh
$1,329
-
kW-mo/yr
$12,578
-
MMBtu
$468
-
MMBtu
TOTAL IMPLEMENTED $9,438 $1,440 - - $8,970
-
MMBtu
$468
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs