Assessment Year | 2003 |
---|---|
Principal Product | Powdered Metals, Alloys, Minerals and Chemicals |
NAICS | 331221: Rolled Steel Shape Manufacturing |
SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
100,000
ft2
|
Annual Production | 12,000
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $150,693 | 2,071,200 |
kWh
|
$0.073 |
Electricity Demand | $79,061 | 6,572 |
kW-mo/yr
|
$12.03 |
Natural Gas | $80,770 | 9,839 |
MMBtu
|
$8.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,188 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,438 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $8,970 | $1,440 | - | - |
$8,970
-
MMBtu
|
- | |
02 | 2.7135: Install occupancy sensors | $2,288 | $500 |
$2,288
31,425
kWh
|
- | - | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $5,356 | $263 |
$4,027
47,861
kWh
|
$1,329
-
kW-mo/yr
|
- | - | |
04 | 2.6218: Turn off equipment when not in use | $468 | - | - | - | - |
$468
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $498 | - |
$498
6,845
kWh
|
- | - | - | |
06 | 2.2312: Minimize non-essential material in heat treatment process | $3,608 | $500 | - | - |
$3,608
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $21,188 | $2,703 |
$6,813
86,131
kWh
|
$1,329
-
kW-mo/yr
|
$12,578
-
MMBtu
|
$468
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,438 | $1,440 | - | - |
$8,970
-
MMBtu
|
$468
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs