ITAC Assessment: OR0214
ITAC logo
ITAC Assessment: OR0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Fish Meal
NAICS
n/a
SIC 2077: Animal and Marine Fats and Oils
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area
n/a
Annual Production 5,000
ton
Production Hrs. Annual 3,640
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,884 786,928
kWh
Natural Gas $118,942 34,769
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,849

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $266 - $266
7,034
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,849 $500 - $3,849
-
MMBtu
-
03 2.3212: Optimize plant power factor $2,080 $4,800 $2,080
-
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $(-128.0) $25 $81
2,052
kWh
- $(-209.0)
TOTAL RECOMMENDED $6,067 $5,325 $2,427
9,086
kWh
$3,849
-
MMBtu
$(-209.0)
TOTAL IMPLEMENTED $3,849 $500 - $3,849
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs