ITAC Assessment: GT0204
ITAC logo
ITAC Assessment: GT0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product BLEACHING GREY GOODS
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area
n/a
Annual Production 17,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $412,383 8,048,945
kWh
Natural Gas $548,490 104,013
MMBtu
Fuel Oil #6 $106,202 23,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $184,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.5192: Modify textile dryers $74,410 $50,000 - $71,248
-
MMBtu
$3,162
-
MMBtu
02 2.5192: Modify textile dryers $67,354 $50,000 - $60,825
-
MMBtu
$6,529
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $8,427 $700 - $6,611
-
MMBtu
$1,816
-
MMBtu
04 2.3191: Use demand controller or load shedder $6,370 $5,000 $6,370
-
kWh
- -
05 2.4133: Use most efficient type of electric motors $19,377 $18,463 $19,377
378,664
kWh
- -
06 2.2414: Use waste heat from hot flue gases to preheat $8,630 $5,999 - $6,645
-
MMBtu
$1,985
-
MMBtu
TOTAL RECOMMENDED $184,568 $130,162 $25,747
378,664
kWh
$145,329
-
MMBtu
$13,492
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs