ITAC Assessment: GT0202
ITAC logo
ITAC Assessment: GT0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product TUFTED CARPET
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area
n/a
Annual Production 18,000
thousand feet
Production Hrs. Annual 3,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,198 3,910,024
kWh
Natural Gas $444,228 95,097
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $189,865 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $8,622 $50 - $8,622
-
MMBtu
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $6,187 $5,000 - $6,187
-
MMBtu
03 2.5191: Modify dye beck $76,425 $140,000 - $76,425
-
MMBtu
04 2.5191: Modify dye beck $30,019 $100,000 - $30,019
-
MMBtu
05 2.5191: Modify dye beck $14,050 $31,000 - $14,050
-
MMBtu
06 2.5192: Modify textile dryers $28,233 $27,000 - $28,233
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $913 $190 $913
19,050
kWh
-
08 2.4133: Use most efficient type of electric motors $6,082 $9,115 $6,082
126,612
kWh
-
09 2.3191: Use demand controller or load shedder $18,169 $40,000 $18,169
-
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $1,165 $1,800 $1,165
24,326
kWh
-
TOTAL RECOMMENDED $189,865 $354,155 $26,329
169,988
kWh
$163,536
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs