| Assessment Year | 1983 |
|---|---|
| Principal Product | TUFTED CARPET |
| NAICS |
n/a
|
| SIC | 2273: Carpets and Rugs |
| Sales Range | $50 M to 100M |
| # of Employees | 400 |
| Plant Area |
n/a
|
| Annual Production | 18,000
thousand feet
|
| Production Hrs. Annual | 3,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $188,198 | 3,910,024 |
kWh
|
$0.048 |
| Natural Gas | $444,228 | 95,097 |
MMBtu
|
$4.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $189,865 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,622 | $50 | - |
$8,622
-
MMBtu
|
|
| 02 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $6,187 | $5,000 | - |
$6,187
-
MMBtu
|
|
| 03 | 2.5191: Modify dye beck | $76,425 | $140,000 | - |
$76,425
-
MMBtu
|
|
| 04 | 2.5191: Modify dye beck | $30,019 | $100,000 | - |
$30,019
-
MMBtu
|
|
| 05 | 2.5191: Modify dye beck | $14,050 | $31,000 | - |
$14,050
-
MMBtu
|
|
| 06 | 2.5192: Modify textile dryers | $28,233 | $27,000 | - |
$28,233
-
MMBtu
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $913 | $190 |
$913
19,050
kWh
|
- | |
| 08 | 2.4133: Use most efficient type of electric motors | $6,082 | $9,115 |
$6,082
126,612
kWh
|
- | |
| 09 | 2.3191: Use demand controller or load shedder | $18,169 | $40,000 |
$18,169
-
kWh
|
- | |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $1,165 | $1,800 |
$1,165
24,326
kWh
|
- | |
| TOTAL RECOMMENDED | $189,865 | $354,155 |
$26,329
169,988
kWh
|
$163,536
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs