ITAC Assessment: GT0193
ITAC logo
ITAC Assessment: GT0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PRINTED FABRICS
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $5
M
to 10
M
# of Employees 300
Plant Area
n/a
Annual Production 22,500
thousand feet
Production Hrs. Annual 5,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,796 3,456,917
kWh
Natural Gas $787,808 183,544
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.5192: Modify textile dryers $159,000 $60,000 - $159,000
-
MMBtu
02 2.1111: Control pressure on steamer operations $13,000 $4,500 - $13,000
-
MMBtu
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $8,300 $5,000 - $8,300
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $4,700 $500 - $4,700
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $10,600 $900 - $10,600
-
MMBtu
06 2.2449: Recover heat from exhausted steam, hot air or hot water $13,000 $3,100 - $13,000
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,163 $4,085 $3,163
56,858
kWh
-
08 2.4133: Use most efficient type of electric motors $8,300 $40,392 $8,300
149,472
kWh
-
TOTAL RECOMMENDED $220,063 $118,477 $11,463
206,330
kWh
$208,600
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs