ITAC Assessment: LE0581
ITAC logo
ITAC Assessment: LE0581
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product All Other Miscellaneous Fabricated Metal Product Manufacturing
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 190
Plant Area 250,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $654,523 6,908,341
kWh
Electricity Demand $60,374 16,527
kW-mo/yr
Electricity Fees $13,059 -
Natural Gas $32,318 4,403
MMBtu
TOTAL YEARLY COSTS $760,274
RECOMMENDED SAVINGS* $16,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,702 $910 $2,465
25,945
kWh
$237
-
kW-mo/yr
02 2.7135: Install occupancy sensors $336 $270 $336
3,538
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,580 $11,000 $8,835
92,995
kWh
$745
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,575 $12,275 $2,241
23,586
kWh
$334
-
kW-mo/yr
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $921 $4,500 $844
8,880
kWh
$77
-
kW-mo/yr
TOTAL RECOMMENDED $16,114 $28,955 $14,721
154,944
kWh
$1,393
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs