ITAC Assessment: OR0034
ITAC logo
ITAC Assessment: OR0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PACKAGED SEAFOOD
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,165 2,662,954
kWh
Fuel Oil #1 $1,503 225
MMBtu
Fuel Oil #2 $41,262 7,494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2114: Shut off steam traps on super heated steam lines when not in use $975 $44 - $975
-
MMBtu
-
02 2.7111: Reduce illumination to minimum necessary levels $1,437 $835 $1,225
36,049
kWh
- $212
03 2.2136: Install / repair insulation on steam lines $1,802 $1,200 - $1,802
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $227 $300 - $727
-
MMBtu
$(-500.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $52 $137 $42
1,172
kWh
- $10
06 2.2414: Use waste heat from hot flue gases to preheat $872 $3,420 - $872
-
MMBtu
-
TOTAL RECOMMENDED $5,365 $5,936 $1,267
37,221
kWh
$4,376
-
MMBtu
$(-278.0)
TOTAL IMPLEMENTED $3,928 $5,101 $42
1,172
kWh
$4,376
-
MMBtu
$(-490.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs