ITAC Assessment: GT0190
ITAC logo
ITAC Assessment: GT0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product INSUSTRIAL PUMPS
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 265
Plant Area
n/a
Annual Production 45,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,445 3,595,252
kWh
Natural Gas $34,854 6,581
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,454 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,468

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,525 $29,000 $22,543
366,061
kWh
$(-8,018.0)
-
MMBtu
02 2.4133: Use most efficient type of electric motors $15,244 $94,000 $15,244
247,655
kWh
-
03 2.3191: Use demand controller or load shedder $9,468 $9,000 $9,468
-
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,821 $6,500 $2,821
45,721
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $2,250 $500 $2,250
90,856
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $146 $500 $146
2,345
kWh
-
TOTAL RECOMMENDED $44,454 $139,500 $52,472
752,638
kWh
$(-8,018.0)
-
MMBtu
TOTAL IMPLEMENTED $9,468 $9,000 $9,468
-
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs